Solargon: conservation of energy through intelligent design and utilization of super efficient building components to create very green cabins and homes.

Saturday, December 10, 2011

Solargon Porch Addition

 
This walkout porch from the Solargon 30 master bedroom is a welcomed addition,
                                  with grand views of the Colorado front range and Indian Peaks.
Framing detail of the 6x10 fur beams See the web album.

Friday, December 2, 2011

Willett Project Complete

The Willett Solargon project was completed this fall and more pictures of this project are coming soon. To see pics click on this link and go to the Willett project.

Tuesday, November 15, 2011

Solargon Link and Loft Completed

  

Completion of the loft above.



View of the loft from the south facing bedroom.

After building the link floor system from the original home to the Solargon, the carpenters are shown framing the roof over the new walls.

South facing view of the inclosed link between the Solargon and original home.
To see more of this Solargon 30 project Click Here
 

Sunday, October 23, 2011

Roof Panels


View of the Stewart/Cool Solargon 30 addition with the roof panels on. To the right is the link which will connect the Solargon to the existing home. This Solargon addition boasts R-42 roof and wall panels giving this super strong structure big advantages over any conventional building.


Above is the link framing to the main house. Two small ponds will be added with a small stream feature running under the link from one to the other.

Wednesday, October 12, 2011

Stewart Progress

Setting the first four roof panels allows us to bridge the roof system over the crown beam assembly and connect to the square skylight compression ring.


Saturday, October 8, 2011

Glen Haven Cabin


This mountain getaway is just 45 minutes from town in the front range of the Colorado Rockies. Located in the canyon can be cold in the winter, so having a R-42 wall and roof package keeps this cabin warmer with minimal energy demands.

Saturday, October 1, 2011

Stewart Master Suite



With the foundation complete the crew will now install the I beam which splits the Solargon floor span with utility room below.



TJI Floor system